Installing Beams, Monday 27th - Tuesday 28th July 2015

The foundation beams arrived on Monday, each in two parts. So there was a lot of hoisting to get the beams up to the bell chamber and a lot of doing up of nuts and bolts to put it all together. Then the pulley blocks were put in and rope holes drilled through the floor below them.