Holy Trinity, Meldreth - Bells Appeal

New floor, Wednesday 15th - Thursday 16th April 2015

A new bell chamber floor was installed, a couple of feet lower than the old one, just above the mechanism driving the hands of the clock. There are two trap doors; a central one for the bells and one for the ladder.

1. The old bell chamber floor from below

2. Setting up access to put in the new floor

3. Joists in place

4. New floor from below (with covered clock mechanism)

5. New floor from above (with old foundation beams)